The first old drum was moved on to the containment platform so that any fuel spilled during the pumping operation could be collected. A cable connecting the pump and the receiving drums helped to prevent build-up of a static electric charge. Although the drums were seeping fuel, most had lost very little of their contents, and thus could not have been leaking for long.

<Prev     Next>