The baskets were set down in several designated areas within the Sable Island Station `compound'. Personnel with EnCana and the engineering contractor (AMEC Black & McDonald) handled ground operations during the slinging. Once all had been delivered, Station staff, using the Station's Bobcat, assisted with deploying heavy gear and supplies.

 

<     >